Skip to content

Open-Source Assessment — Template

Version: 1.1.0 | Licence: CC BY 4.0

Tools for deciding how to use, support, contribute to or exit an open-source dependency. A score structures discussion; it never replaces expert review, delegated decisions or a critical legal, security or operational concern.

Related: Open Source Strategy & Governance.

1. Option scorecard

Compare open-source and non-open-source options (existing capability, process change, commercial, managed service, build, defer) against the same outcome and lifecycle assumptions. Rate each dimension 1 (weak) to 5 (strong), and record evidence and confidence.

Dimension Weight Consider
Strategic and functional fit 20% Does the capability support an agreed outcome and user need?
Ecosystem sustainability and governance health 15% Project activity, governance clarity, maintainer diversity, release practices, succession signals
Security and operational readiness 15% Vulnerability handling, update path, dependency transparency, support, service fit
Legal and licence fit 15% Licence obligations, intended use and distribution, notices; review by qualified counsel
Interoperability and exit options 10% Standards, portability, data access, practical migration path
Total lifecycle economics 15% Adoption, integration, assurance, support, upgrades, training, exit costs
Internal capability and stewardship 10% Skills, accountable owners, contribution capacity, ability to sustain the choice

Weighted total = sum of (rating × weight), on a 1–5 scale, as in the weighted scoring matrix. Do not average away a critical concern. A high score with low confidence should trigger due diligence or a bounded evaluation. Weights are a starting point, not a standard.

Option Fit (20) Ecosystem (15) Security (15) Legal (15) Exit (10) Economics (15) Capability (10) Weighted Confidence

2. Decision outcomes

Evidence and fit Suggested outcome
Strong fit, adequate evidence, funded operating ownership Adopt with standard controls and a named lifecycle owner
Potentially strong fit, material uncertainty Time-box due diligence or a bounded evaluation with exit criteria
Valuable strategic dependency, under-supported upstream project Assess proportionate support, contribution, mirror or fork, or an alternative; none is automatically right
Weak fit, unacceptable obligation or no credible maintenance path Reject, replace, isolate or plan exit with accountable authority
Internal use is valuable but public contribution is not authorised or practical Use within policy and document why contribution is not selected

3. Governance-health checklist (for material dependencies)

Technical quality is not governance health. A technically excellent project can still concentrate control in a few people.

  • [ ] Maintainer concentration is understood (how many people can release or decide).
  • [ ] Organisational diversity of maintainers and sponsors is understood.
  • [ ] Repository and release privileges are known and not held by a single person or organisation.
  • [ ] Decision-making is transparent and documented.
  • [ ] The project is open to new contributors, with a clear path to maintainership.
  • [ ] Change, deprecation and migration practices are published.
  • [ ] Succession and release continuity are credible.
  • [ ] A dispute-resolution route exists.

Popularity and commit activity are useful signals but do not prove sustainable governance.

4. Choosing a participation mode

Participation is a deliberate choice, not a ladder every organisation should climb.

Mode Organisational activity Governance question
Use Consume a component with appropriate ownership Is it suitable, authorised, maintained and supportable?
Enable Make approved capabilities discoverable through policy, catalogues or platforms Are guardrails and support paths clear to teams?
Support Fund, sponsor, test, document or otherwise support a project Is support aligned to a strategic dependency and governed transparently?
Contribute Return code, documentation, testing or design work upstream Are rights, review, security and time allocation clear?
Collaborate Take part in roadmaps, specifications or shared initiatives Is there a mandate, a representative and a decision process?
Steward Accept sustained responsibility for governance, releases or maintenance Are long-term accountability, resources and succession explicit?

5. Contribution plan

Field Entry
Project and capability dependency
Participation mode and expected organisational value
Contribution scope (testing, documentation, issue triage, code, funding, governance)
Organisational sponsor and authorised representative
Staff time, funding, review capacity and continuity plan
Security, legal, IP and communications checks
Measures of upstream engagement and internal value
Conditions to pause, change mode or exit

Funding does not automatically buy control, a submitted change is not guaranteed to be accepted, and a large user should not automatically gain a veto.

Before public contribution

  • [ ] Contributor authority, intellectual-property rights and organisational policy are confirmed.
  • [ ] The contribution channel and review process are selected.
  • [ ] Secrets, personal data, confidential material, security issues and third-party rights are checked.
  • [ ] Engineering, security, legal and communications reviews are complete.
  • [ ] Who may speak for the organisation, and how maintenance will continue, are agreed.
  • [ ] Authorised accounts are used.

6. Fork, mirror and exit readiness

The legal possibility of forking is not the same as the operational ability to sustain a fork. Forkability contributes to resilience only when it is operationally credible.

  • [ ] Rights under the licence are sufficient for the intended continuity approach.
  • [ ] Source and history can be retained appropriately.
  • [ ] Builds are reproducible.
  • [ ] Critical dependencies are understood.
  • [ ] Engineering skills are available.
  • [ ] Vulnerabilities and releases can be managed.
  • [ ] Governance authority for the mirror or fork is clear.
  • [ ] Long-term maintenance is economically realistic.
  • [ ] Conditions for returning upstream, replacing or retiring the fork are defined.

7. Procurement checks

Focus on the service and lifecycle around the software, not on the absence of a licence fee.

  • [ ] Functional fit, licence obligations and project governance are assessed.
  • [ ] Maintenance, security response and supply-chain evidence (for example an SBOM, where appropriate) are available. Common formats include SPDX and CycloneDX.
  • [ ] Interoperability, portability and ecosystem concentration are understood.
  • [ ] Support arrangements, lifecycle cost and exit are defined.
  • [ ] Effective control by a single system integrator is made visible: open source can still lock you in through skills, deployment knowledge, tooling or contracts.

8. Fictional decision record

Illustrative only. "the fictional transit authority" and its findings are invented; no conclusion about a real project is implied.

Field Entry
Decision Approve a bounded hardening and support assessment; do not commit to long-term support or public contribution yet
Rationale Strong functional fit and an active project, but gaps in internal ownership and vulnerability response
Conditions Named service and technical owners; advisory intake and patch process in place; licence review by qualified counsel
Revisit when Assessment results are available, a critical advisory affects the service, or project health changes materially
Evidence status All findings remain assumptions until measured

Template for adaptation. Independent professional guidance, not legal advice or a security certification.